Interior transformation
A home ready to live in
An interior transformation designed, priced and furnished during the purchase period, so the work could begin soon after the keys arrived.
The clients had an accepted offer and a long purchase ahead of them. They did not want to wait for the keys to start.
- Scope
- Interior design, procurement, project leadership
- Began
- Before completion
- On site
- About two months
01
Before this house
The relationship began with a different house
Early design work on a property the clients were considering showed it would not do what they needed. That work was not wasted. It made reading the next one much quicker, and it is the reason the second house could be assessed and designed inside the length of a purchase.
02
The waiting
The work itself was not shortened. The waiting was used.
Access was arranged, the house was measured, and the design, the construction information, the pricing and the furniture were all settled before completion.
Furniture and key items were selected in advance and held or prepared rather than committed, so nothing substantial was at risk while the purchase was still open.
03
The exchange
The two principal rooms exchanged function
What had been the dining room became the living room and what had been the living room became the dining room. It is the kind of change that costs nothing on paper and is close to impossible to argue for once furniture has arrived.
04
The kitchen
Brought into the language of the rest of the house
05
The media room
The one room allowed to go dark
06
The attic bedroom
A loft room turned into the principal suite
The top of the house had the space but none of the storage a main bedroom needs. The awkward geometry under the roof is where the wardrobes and the dressing area now sit.
07
On site
Two months, in an occupied house
Everything was drawn and priced before the keys arrived, so the site work was installation rather than decision-making.
08
Furniture
Held or prepared, rather than committed
Because the selections were made months earlier, the rooms could be finished as designed rather than furnished from whatever was available when the building work stopped.
09
Outcome
Once the keys arrived the work took about two months, and the clients moved into a finished house rather than into a project.
- Services
- Interior design · Procurement · Project leadership
- Key moves
- Living and dining exchanged, kitchen refaced and relit around the existing island, media room darkened, attic made the principal suite, furniture pre-selected