Ready by Completion

Start designing before you own the keys.

Completion day is usually the starting gun. It does not have to be.

A completed living room, designed and procured during the purchase period so work could begin at handover
Designed and procured during the purchase period, so the work began at handover rather than months after it.

The two sequences

What changes is the order, not the amount of work.

Furnished, finished and ready when you arrive.
Completion · keys
The usual sequence
Purchase progresses · nothing designed · client waits
Survey & design
Detailing & FF&E
Tender
Lead times
Work begins ●
Ready by Completion
Purchase progresses
Survey & measured drawings
Concept & scheme design
Joinery details & FF&E specification
Tender & contractor appointed
Long-lead items specified
● Work begins
The usual sequence
  1. Purchase progresses · nothing designed · client waits
  2. Completion · keys
  3. Survey and design
  4. Detailing and FF&E
  5. Tender
  6. Lead times
  7. Work begins
Ready by Completion
  1. Survey and measured drawings
  2. Concept and scheme design
  3. Joinery details and FF&E specification
  4. Tender and contractor appointed
  5. Long-lead items specified
  6. Completion · keys
  7. Work begins
Start designing before you own the keys.
Completion · keys
The usual sequence
Purchase progresses · nothing designed · client waits
Survey & design
Planning
Tender
Lead times
Ready by Completion
Purchase progresses
Measured survey
Feasibility
Pre-application or full planning
The usual sequence
  1. Purchase progresses · nothing designed · client waits
  2. Completion · keys
  3. Survey and design
  4. Planning
  5. Tender
  6. Lead times
Ready by Completion
  1. Measured survey
  2. Feasibility
  3. Pre-application or full planning
  4. Completion · keys
  5. Intrusive survey once the building is yours

The problem

For most people nothing happens until the keys change hands. Only then is the survey booked, the drawings begun, the approvals filed and the long-lead items ordered, each waiting on the one before it. The house sits empty while a sequence runs that could have run earlier.

Once an offer is accepted and access can be arranged, much of that preparation can happen alongside the legal process instead of behind it. Survey, design, planning and procurement are not owned by the purchase; they only feel like they are.

The aim is to reach completion with the design substantially resolved, the necessary approvals secured or progressing, a contractor selected where the programme allows, and long-lead items ready to order.

The building work still takes the time it needs. What can be removed is the long period of preparation that usually begins only after the keys arrive.

The approach depends on access, timely decisions and the purchase completing. Planning and legal timescales remain outside anyone’s control, ours included.

Some of it stays provisional. Without intrusive investigation, parts of the existing structure and the hidden services remain a working assumption rather than a confirmed fact, and the job is to record which is which and revisit them as more becomes known. Before exchange the purchase is not binding, so what you spend is at risk, which is why nothing is ordered at that stage. Can you start design work on a house before you own it? sets out what can move early, what waits, and what is worth risking.


What we need from you

Early, as soon as the offer is accepted
An introduction to the agent so access for a survey can be arranged. This is the one genuine dependency, and it needs the vendor's goodwill rather than yours.
In the first fortnight
A conversation about how you want to live in the house, and any documents you already hold: searches, existing drawings, a survey.
Before exchange
Decisions on the direction, so that the detailed design can run while the solicitors do. Nothing is ordered at this point.
At exchange
Authorisation to place deposits on long-lead items, if you want them on site soon after handover. Until then they are specified and priced, not bought.

Start with a feasibility study

An engagement begins with a feasibility study, a short, paid piece of work that tests what the property can become before anything is committed. A few questions first, because the answers decide whether this approach is open to you at all. If it is not, we will say so.

Has an offer been accepted?
Solicitor appointed?
Can access to the property be arranged?
Useful only because access is usually arranged through them.

We use your details to respond to your enquiry. See our privacy policy.